4,916 upcoming projects, followed from the first land and power agreement through to energisation. MW capacity, capex, general contractors, tenders, and verified developer contacts.
As of 23 October 2026, Blackridge Research & Consulting tracks 4,916 upcoming data center projects worldwide, representing $865.38 trillion in announced capital expenditure.
Scroll to zoom, drag to pan, click a country to zoom into it. One dataset shades the map at a time, switch below.
Halo area is proportional to the active dataset in that region. Hover any country for the region totals that cover it.
zoom 1.0x
in the full database, filtered to your territory.
What it is
A market intelligence platform tracking data center projects worldwide, from the earliest land rumors and grid signals through permitting, design, tendering, construction, commissioning, and operation. Every record carries verified investment values, MW capacity, timelines, stakeholders, tenders, and decision-maker contacts.
Colocation providers, hyperscalers, contractors and power and cooling vendors use it to see campuses before planning filings go public, time bids to the procurement window, and follow a site through each phase of its build.
Coverage begins before announcement, with land and power purchase agreements, utility load requests, tax abatement applications and code-named planning filings read in the local language by the analyst assigned to that market.
Developer, hyperscale tenant where disclosed, general contractor, electrical and mechanical contractors, and power and cooling equipment suppliers are mapped to each campus with verified contacts.
Each campus carries its stage, from land acquisition and power allocation through construction to phased energisation, and an alert fires when a campus on your watchlist changes stage.
Capacity figures, power agreements and contract awards are each reconciled against two independent sources, cited, and dated with when they were last verified, so the basis can be checked before a bid team is committed.
Pipeline Preview
Ranked by announced capex, these are the ten largest data center campuses in the pipeline; in the full database each one links to its planning filings, power agreements, contractor awards and named developer contacts.
| # | Project | Location | Capacity | Capex | Stage | Companies | Updated |
|---|---|---|---|---|---|---|---|
| 1 | Data Center Development / JC3 Campus - Jakarta, Indonesia | Not disclosed | $856.00T | On-going / Under Construction | 1 | ||
| 2 | SBE - Ports Technology Campus Redevelopment | Ohio, United States | Not disclosed | $500B | On-going / Under Construction | 8 | 2026-08-17 |
| 3 | FA/TTU - Project Matador AI Data Center Campus | Texas, United States | Not disclosed | $121B | Pre-Construction | 3 | 2026-02-26 |
| 4 | GS - Donghae Data Center | Gangwon-do, South Korea | 2,400 MW | $88B | Pre-Construction | 4 | 2026-08-25 |
| 5 | NUAI - Lea County Data Center | New Mexico, United States | 7,000 MW | $77B | Planning | 1 | 2025-11-06 |
| 6 | SACIII - Berry Hill Data Center | Virginia, United States | 299 MW | $74B | Planning | 1 | 2026-06-29 |
| 7 | OLV/MCG - Wonder Valley Alberta Data Center | Alberta, Canada | Not disclosed | $70B | Design | 3 | 2026-09-03 |
| 8 | PD - Heartland Industrial Park Data Center Campus | Indiana, United States | Not disclosed | $65B | On-going / Under Construction | 2 | 2026-04-23 |
| 9 | BAM/NEE - Paducah Data Center | Kentucky, United States | 4,600 MW | $51B | Planning | 5 | 2026-08-04 |
| 10 | META/BOC - Richland Parish Data Center Campus | Louisiana, United States | 5,000 MW | $50B | On-going / Under Construction | 6 | 2026-07-13 |
Who is building
The most active owners and developers in the pipeline, ranked by the number of projects they hold, with the stage those projects have reached. Select a company to get its full project list and verified contacts.
Blackridge Research & Consulting tracks 2,174 owners and developers across the data center pipeline. The most active is Microsoft Corporation, with 120 projects.
Top 25 of 2,174 companies
Market intelligence
Blackridge tracks 2,174 owners and developers across the data center pipeline. The 25 most active hold 890 projects between them, led by Microsoft Corporation (120), Amazon Web Services, Inc. (92) and Prologis (51).
The five busiest account for 39% of the projects held by the top 25, so the pipeline is spread across a broad field of builders rather than a few dominant ones.
Of the top 25, 19 act as owners only and 6 both own and develop.
Across their projects, 36% are already past contract award. Microsoft Corporation has the most in that phase, with 63 projects at award or under construction.
By capacity, PowerHouse Data Centers, Inc. holds the largest position among them, 7.1 GW across 20 projects.
Full profiles for all 2,174 companies, with their project lists, contract awards and verified contacts, are in the database.
Company questions
Ranked by the number of upcoming projects they hold as owner or developer, the most active data center companies are Microsoft Corporation (120), Amazon Web Services, Inc. (92), Prologis (51), Stack Infrastructure, Inc (46) and Google Inc. (40). Blackridge tracks 2,174 companies across the pipeline in total.
Blackridge Research & Consulting tracks 2,174 owners and developers with upcoming data center projects. The 25 most active hold 890 projects between them.
By number of projects, Microsoft Corporation is the most active, with 120 upcoming projects as owner. Of these, 63 are past contract award, 55 in study, planning or design and 2 announced. Amazon Web Services, Inc. follows with 92 projects.
Counting projects at contract award, pre-construction or under construction, the leaders are Microsoft Corporation (63), Stack Infrastructure, Inc (30) and Vantage Data Centers, LLC. (29).
Among the 25 most active, 6 companies act as both owner and developer: Stack Infrastructure, Inc, Google Inc., Prime Data Centers, Inc, EdgeConneX, Inc., PowerHouse Data Centers, Inc. and T5 Data Centers, LLC.
PowerHouse Data Centers, Inc. holds the largest capacity among the most active companies, 7.1 GW across 20 projects.
Of the projects held by the 25 most active companies, 36% are already past contract award, and the rest are in study, planning, design or announced.
Microsoft Corporation holds 120 upcoming data center projects as owner. Of these, 63 are past contract award, 55 in study, planning or design and 2 announced. It ranks #1 of the 2,174 companies Blackridge tracks by project count.
Amazon Web Services, Inc. holds 92 upcoming data center projects as owner. Of these, 13 are past contract award, 78 in study, planning or design and 1 announced. It ranks #2 of the 2,174 companies Blackridge tracks by project count.
Prologis holds 51 upcoming data center projects as owner. Of these, 6 are past contract award and 45 in study, planning or design. It ranks #3 of the 2,174 companies Blackridge tracks by project count.
Stack Infrastructure, Inc holds 46 upcoming data center projects as owner and developer. Of these, 30 are past contract award, 15 in study, planning or design and 1 announced. It ranks #4 of the 2,174 companies Blackridge tracks by project count.
Google Inc. holds 40 upcoming data center projects as owner and developer. Of these, 11 are past contract award, 26 in study, planning or design and 3 announced. It ranks #5 of the 2,174 companies Blackridge tracks by project count.
Recent intelligence
The latest data center project news from around the world: announcements, permits, contract awards, groundbreakings and expansions, published as they are reported.
Market Intelligence
Nine stages in four phase families, each cell sized by the number of tracked projects at that stage, running from the earliest signals through to energisation.
| Stage | Projects | Capacity | CapEx |
|---|
Where the tracked pipeline actually sits. Counts come straight from the live database and are compared against the busiest region, not against a total: the regions overlap, so they are never added together.
Bars are scaled to the busiest region. A project in a country belonging to more than one grouping is counted in each, so these figures are not additive.
Market intelligence
Of the 4,916 upcoming data center projects tracked, 30% are at contract award, pre-construction or under construction, 65% are in study, planning or design and 5% have only been announced. Planning is the largest single stage, with 2,874 projects.
North America holds the most tracked projects, 2,448 or 50% of the pipeline, followed by Europe (1,234) and Asia-Pacific (858).
By announced investment, North America leads with $6.24 trillion and also has the largest average ticket, $2.5 billion per project.
Construction is furthest along in the Middle East, where 55% of tracked projects are past contract award, compared with 26% in Africa.
Every project behind these figures, with its stage history, contractors and verified contacts, is in the full database.
FAQ
About the database
Coverage and data
Market fundamentals
Data quality and methodology
Plans and getting started
Get Started
Join investors, developers, and contractors who use the database to stay ahead of the worldwide data center build-out.